Cambridge Zen Center Physical Plant UPCOMING PROJECTS: * Move outside door and window in kitchen. Install new counter and cabinets along back wall. * Convert rooms 1 and 3 into interview rooms. * Prepare current interview room to become the new office. * Remove the 3rd floor 197 bathroom to open the hallway. * Remove the chimney and air vents from 197 (w/ stove and furnace). Repair roof, walls and floors. Install a new furnace w/ a vent going into the chimney of 199. Build a new doorway and wall between new back entrance and new room. * Convert 193 bathroom into a larger handicapped accessible bathroom. Remove storage closet. * Open a hallway/entrance spanning the front of the building. Install shoji screen/walls in Dharma room and new room. Repair walls and flooring. * Renovate new central entrance (archway, front doors). ONGOING: * Updating sinks, showers, tiles and toilets in bathrooms throughout. * Scraping, caulking and painting outside window sills. * Touching up unoccupied rooms. * Everyday maintenance.